Project Gallery
| Date | Client | Project/Equipment | Description | Approx Value $M |
| 2010 | Duratray | 3 tray bodies for Cat 789 Rear Dump Trucks |
|
.37 |
| 2010 | BMA Gregory | CHPP Shutdown |
|
2.2 |
| 2010 | BMA Hay Point | Berth 2 and SL 2 Health and Safety Upgrade |
|
2.5 |
| 2010 | BMA Saraji | SHE 34 Refurbish Car Body |
|
1.0 |
| 2010 | BMA Saraji | SHE34 – Strip Shovel and Refurbish Components |
|
.50 |
| 2010 | Broadspectrum | Change out SRO1 Boom at Blair Athol |
|
1.1 |
| 2009 | BMA Hay Point | SL2 & Berth 2 Fender Upgrade |
|
9.4 |
| 2010 | Broadspectrum | SR01 Boom Change Out |
|
1.1 |
| 2010 | Haypoint | July / August Heath & Safety Upgrade Shutdown |
|
2.5 |
| 2010 | BMA – Saraji | SHE34 Refurbishment |
|
1.0 |
| 2009 | Rio Tinto Blair Athol Coal | Manufacture of two Bucketwheel and two Booms |
|
3.6 |
| 2009 | BMA – Hay Point Services | SL2 & Berth 2 Fender Upgrade Site Works |
|
8 |
| 2009 | BMA – Norwich Park | DRE 12 Boom Upgrade |
|
.5 |
| 2009 | BMA – Blackwater | DRE 38 Tub Relocation |
|
.75 |
| 2008 | BMA Norwich Park | Dragline DRE 20 |
|
4.6 |
| 2008 – 2006 | BMA Alliance Coal Operations Pty Ltd – Hay Point | Hay Point Shiploader – SL1 |
|
8.2 |
| 2008 | BMA Alliance Coal Operations Pty Ltd – Crinum East Mine | Trunk East No. 1 Conveyor Installation |
|
1.2 |
| 2008 | Golding Contractors Pty Ltd | Forgan Bridge Project | Supply, Draft, Fabricate, Surface Treat and Deliver in excess of 700T of Temporary Support Steel Work for Forgan Bridge Project | 3.0 |
| 2008
- 2007 |
Dalrymple Bay Coal Terminal 7X Project | SR4 Relocation and Upgrade to RL2 | Complete disassembly and relocation of 1200T Stacker/ Reclaimer SR4 and conversion to Reclaimer RL2 on a new bund, including new boom and hydraulic bucketwheel system. | 10.1 |
| 2007 | Dalrymple Bay Coal Terminal 7X Project | Upgrades to Shiploader SL2 | Major upgrades to boom structure, shuttle trolley and system, installation of new high power VVVF luff winch, upgrade of long travel motors and bogies to comply with AS 4324. | 3.6 |
| 2007 | Dalrymple Bay Coal Terminal 7X Project | Upgrades to Stacker / Reclaimer SR5 | Slew bearing replacement, rebore slew bores, upgrade rail clamps and structure to AS 4324. | 2.8 |
| 2007 | BMA Alliance Coal Operations Pty Ltd – Crinum East Mine | Mechanical Installation – Ramp Conveyor | Set out and pour concrete foundations (500m³), assemble and erect 1800m of conveyor modules, drive station and head end discharge tower. | 4.2 |
| 2007 | Xstrata Coal Queensland Pty Ltd | Newlands Coal – 1200T Bin Refurbishment (2 off) | Supply, fabricate and install new 316 S/S Cones to 12m diameter raw coal surge bins. | 2.2 |
| 2007 | Inbye Mining Services | Oaky North – North Shield Base Shutdown | Disassemble and replace bases on 100 roof supports, including replacement of all control valves and hydraulic lines. | 1 |
| 2007 | Xstrata Coal Queensland Pty Ltd | Newlands Coal – Wash Plant | Six month contract for de-bottlenecking new plant, provision of maintenance labour and equipment. Manufacture and install modified steelworks. | .6 |
| 2007 | BMA Alliance Coal Operations Pty Ltd – Peak Downs | 5 South ANFO Shed Upgrade | High pressure wash and repaint existing structure, supply and install S/S walkway, platforms and access stairs, form and pour additional concrete works. | .5 |
| 2006 | BMA Alliance Coal Operations Pty Ltd – Crinum East Mine | Trunk West Conveyor Installation |
|
2.0 |
| 2006 – 2003 | BMA Coal (BHP Billiton Mitsubishi Alliance) | Universal Dragline Retrofit rollout to fleet of 8 draglines in BMA Coal Mines in the Bowen Basin, Central Queensland | Total Project Management Services for the Design, Supply and Installation of the UDD System throughout four mines including fabrication of new 30t boom point and hoist drum and gearbox | 4.0 |
| 2005
- 2004 |
Port Waratah Coal Service | Reclaimer 1 Return to Service Upgrade |
|
2.5 |
| 2006
- 2005 |
BMA Alliance Coal Operations Pty Ltd – Hay Point | Hay Point Shiploader # 1 |
|
2.8 |
| 2007 | Thiess Pty Ltd – Collinsville Mine | Ongoing fortnightly shutdowns | CHPP – piping, pump, screen, and conveyor maintenance. | |
| 2005 | BMA Alliance Coal Operations Pty Ltd – Hay Point | Hay Point Lighting Towers | Fabricate and install 30m Lighting Towers on Berth 2 at Hay Point. | |
| 2005 | Westhill Engineering | ROM Bin for Blackwater Comet Project | Fabricate and Weld ROM Hopper Bins. | |
| 2005 | BMA Alliance Coal Operations Pty Ltd – Hay Point | MD1 Mooring Dolphin Upgrade | Remove old mooring line winch and hooks and replace with two (2) new winches and hooks. Supply and install new S/S safety barriers | |
| 2005 | BMA Alliance Coal Operations Pty Ltd – South Walker | Warehouse Duplication | Design, fabricate and erect a duplication of the existing warehouse, including concrete, steelwork, cladding and electrics | |
| 2005 | Hitachi Construction Machinery (Australia) Pty Ltd | Hitachi 3500 Undercarriage
Hitachi 3500 Boom Hitachi 5500 Bucket |
|
|
| 2004 | Thiess Pty Ltd | Collinsville Coal CHPP Upgrade | Supply and manufacture a complete Vibrating Screen Mechanism Beam and Deck Structure | |
| 2005 | Anglo Coal (Capcoal Management) Pty Ltd | Capcoal Highwall Miner Shelters | Supply, Fabrication and Delivery of Highwall Miner Shelters | |
| 2004 | HMP Constructions Pty Ltd | Helvory Mining, Goonyella | Relocation of Goonyella Workshop to Goonyella/Riverside Site | |
| 2005 –
2004 |
Boral Blue Circle Cement – NSW | Reclaimer 1 Overhaul | 3 Row Roller Slew Bearing Replacement and Epoxy Grouting | |
| 2004 | Wesfarmers Curragh Coal Mine | Raw Coal Reclaimer A
Raw Coal Reclaimer B |
Capacity upgrade and refurbishment. Fabrication and Erect | |
| 2003 | Pacific Coal Pty Ltd | BAC 2100 Shovel SD | Major shutdown Mechanical Repairs | |
| 2002-2001 | BMA Coal (BHP Billiton Mitsubishi Alliance) | Universal Dragline Conversion of DRE 23 at Peak Downs Mine | Total Project Management Services for the Design, Manufacture and Installation of the radically different hoist control system | |
| 2002 | Blair Athol Coal (Rio Tinto) | Rail Load out Bin Reline Stages 1-3 | Replace Lower Cone lining in 3000T capacity coal load out bin Replace Upper Cone lining in 3000T capacity coal load out bin
Replace Cylindrical body lining in 3000T capacity coal load out bin |
|
| 2002 | Blair Athol Coal (Rio Tinto) | Rotary Breaker Changeout and Apron Feeder major overhaul | Remove rotary breaker No 1, replace drive end tyre and reinstalled. Apron feeder – replaced all flight chains and support rollers | |
| 2002 | Temco – Bell Bay Tasmania | Slew Bearing Replacement on ship unloader | Project Managed the execution of the safe removal and replacement of the slew bearing, including in situ machining of upper and lower bearing path | |
| 2001 | Mitsubishi Heavy Industries | SR4 Slew Drive Pinion Replacement | Remove and replace two slew drive pinion shafts with upgraded pinions | |
| 2001 | Mitsubishi Heavy Industries | Preparation of Manuals and As Built Drawings for SR4 and SR5 | Electrical and Mechanical manuals, preparation and distribution. Drawings 900 per machine | |
| 2001 | Ports Corporation of Queensland | Dalrymple Bay Coal Terminal Ship Loader L8 Tripper Modifications | Re-align and fish plate all rail joints on the wharf tripper. Realign all tripper wheels carried modifications on tripper conveyor support structure | |
| 2001 | John Holland Group | Thermit Welding of ST2 Rail Track at Dalrymple Bay Coal Terminal | Installation and Thermit welding of 106 joints, over 1.2 kms | |
| 2001 | Blair Athol Coal (Rio Tinto) | SR2 Stacker Reclaimer 2 | Bucketwheel, Bucketwheel shaft and gear box replacement
Boom lacing replacement, upper and lower chords and Luff Cylinder replacements |
|
| 2000 | Ports Corporation of Queensland | Weighing of Shiploader at Dalrymple Bay Coal Terminal | Design reviews In conjunction with consulting engineers and execution of in situ weighing of 1200T rail mounted ship loader four bogies simultaneously at Dalrymple Bay Coal Terminal | |
| 2000 | Mitsubishi Heavy Industries | Bucketwheel Shaft Replacement | Complete removal and installation of Bucketwheel shaft and gearbox | |
| 2000 | Mitsubishi Heavy Industries | Bund 5 Booster Pump | Design, installation and commissioning of a 20 litre per sec 300 psi water addition pumping system to SR4 and SR5 | |
| 2000-1999 | BHP – Saraji Mine | DRE 11 Recovery | In conjunction with the OEM (Original Equipment Manufacturer) project managed the recovery of DRE 11 from collapsed in pit bench | |
| 1999 | Mitsubishi Heavy Industries | Maintenance Shutdown on SR4 | Removal of Bucketwheel Shaft, refurbishment with HVOF process and re installation. Disc Brake Retrofit. Managed the design and implemented the installation of anti collision system between SR4 and SR5 |