Equipment Enhancements

Team Engineering Services is proud to have Project Managed a major Research and Development project for BMA – Peak Downs: --the Universal Dig Dump Project. This project coordinated the designers, suppliers and contractors Australia wide and resulted in achieving a 29% improvement in the dig capacity of a 20-year-old BE1370 dragline. The Return on Investment of this retrofit is approximately one (1) year. As a result TEAM is now managing a UDD rollout to a fleet of 8 draglines with the potential of a further 10 machines over the next five years.
 
DRE23 Universal Dig Dump
Project Management of the Design, Procurement,
Installation and Commissioning and Performance
Testing at Peak Downs Mine
 
DRE23 UDD Boom Point
The old boom point was removed and replaced with a
new 30 tonne boom point with the UDD configuration
 
UDD Hoist Drum
The existing single Hoist Drum was replaced with the new UDD spilt drum configuration
 
  CANNINGTON SHIPLOADER
Design Review and Construction including coordinating
the loading onto the Happy Buccaneer